The layout size as shown here is 8 feet 4.5 feet.
Construction is Woodland Scenics Sub-terrain System - Chuck Harrington (myflyertrains) Viewed: 504 times.
|
S-Helper S-Trax Flex is being used for the layout. The bridge is K-line. - Chuck Harrington (myflyertrains) Viewed: 403 times.
|
A small village was to have lived in the clearing, but I decided to squeeze in a
turntable and 7 stall roundhose instead!
- Chuck Harrington (myflyertrains) Viewed: 408 times.
|
| | |
| | |
|
|
|
|
The earth base coat wash is being applied. - Chuck Harrington (myflyertrains) Viewed: 402 times.
|
S-Helper S-Trax Flex is being used for the layout. The bridge is K-line. - Chuck Harrington (myflyertrains) Viewed: 411 times.
|
A "modified" Gilbert 720 switch has been fitted into the roadbed! Delair switch controls have been obtained in order to control the switches remotely. - Chuck Harrington (myflyertrains) Viewed: 382 times.
|
| | |
| | |
|
|
|
|
The engines sit where the future engine house will be constructed.
- Chuck Harrington (myflyertrains) Viewed: 343 times.
|
The walls of the engine house have been erected. - Chuck Harrington (myflyertrains) Viewed: 371 times.
|
Engine House view 2 - Still needs roof and more internal finishing... - Chuck Harrington (myflyertrains) Viewed: 432 times.
|
| | |